YEVDES Ankara University SPP Integration Project
Within the scope of YEVDES projects, GES feasibility study for Ankara University Gölbaşı campus
- 2.58 MWpCapacity
- AnkaraProvince
- TürkiyeCountry
- 2021Year
Investor
YEVDES
Scope
- Production Work
- Consumption & Production Integration Analysis
- Feasibility Study
Standards
IEC 61724-1IEC TS 61724-3IEC 62548IEC 61724IEC 62446-1