Owner's and lender's engineering
Find design problems before they become construction problems.
We sit on the owner's or the lender's side from design review through to provisional acceptance: layout and civil review, electrical design review, technical specification and tender support, and supervision of the works against the specification. We do not produce the design. Our independence depends on that.
DesignBuild
What we do
- Design and layout review
- Electrical design review
- Technical specification and tender support
- Technical contract management
- Construction supervision and progress verification
Standards
IEC 62548IEC 62446-1
Projects in this area · 171
| Plant | Investor | Capacity MWp | Province | Year | Scope |
|---|---|---|---|---|---|
| Kalyon Energy Konya Karapinar 1,300MWp YEKA Project | Kalyon Güneş Enerjisi Üretim A.Ş | 1,350 | Konya | 2020 | Site Review; Plant Design Review |
| AKSA ENERJİ – Ali Metin Kazanci Termal Pp – Antalya | Aksa Enerji | 900 | Antalya | 2021 | Employer Engineering |
| İÇTAŞ Renewable Energy Production and Trade Inc. – İçtaş Bağıştaş HEPP Hybrid – Erzincan | IC İctaş | 140 | Erzincan | 2024 | Energy Efficiency Analysis |
| IC Ictas – Erzin 2 YEKA SPP – Hatay | IC İctaş | 136 | Hatay | 2025 | Field Inspection and Electrical Tests (according to IEC 62446) |
| Diler Holding – Kars SPP – Kars | Diler Holding | 130 | Kars | 2026 | Employer Engineering |
| Ecogreen – Bor 2 YEKA SPP – Nigde | Ecogreen | 130 | Niğde | 2023 | Employer Engineering |
| Eksim Holding – Erzin 1 YEKA SPP – Hatay | Eksim Holding | 130 | Hatay | 2024 | Contract Management and Energy Efficiency Analysis |
| Turk Telekom – Zara SPP – Sivas | Türk Telekom | 128 | Sivas | 2025 | Employer Engineering |
| Kosovo SPP – Güriş İnşaat Mühendislik İnşaat A.Ş. & Ilgaz Elektrik Üretim A.Ş. – 1 | Güriş Inşaat Mühendislik A.Ş. & Ilgaz Elektrik Üretim A.Ş.-1 | 120 | Kosova | 2025 | Investor Engineering |
| Oyak Cement – Ankara 1 SPP – Ankara | Oyak Çimento | 115 | Ankara | 2025 | Employer Engineering |
| Diler Holding – Diler Konya SPP – Konya | Diler Holding | 100 | Konya | 2026 | Employer Engineering |
| RHG Enertürk Energy – Bor Yeka SPP – 4 – Nigde | RHG Enertürk | 100 | Niğde | 2022 | Tender Preparation and Energy Efficiency Analysis |
| Aydem Energy – Yatagan SPP – Mugla | Aydem Enerji | 95 | Muğla | 2026 | Employer Engineering |
| Erciyes Anadolu Holding – Mini YEKA Van SPP – Van | Erciyes Anadolu Holding | 75 | Van | 2024 | Tender Preparation and Energy Efficiency Analysis |
| Tatlıpınar – Tatlıpınar SPP – 1 – Balıkesir | Tatlıpınar | 70 | Balıkesir | 2024 | Employer Engineering |
| Diler Holding – Diler Agri SPP – Agri | Diler Holding | 55 | Ağrı | 2026 | Employer Engineering |
| Erciyes Anadolu Holding – Van Arisu SPP – Van | Erciyes Anadolu Holding | 55 | Van | 2020 | Employer Engineering |
| Demirer Holding – Sayalar SPP – Manisa | Demirer Holding | 53 | Manisa | 2022 | Employer Engineering |
| Acacia Maden – Acacia SPP – Ankara | Acacia Maden | 50 | Ankara | 2022 | Energy Efficiency Analysis |
| Demirer Holding – Kuyucak Wind Hybrid SPP – Manisa | Demirer Holding | 50 | Manisa | 2023 | Employer Engineering |
| RHG Enertürk Energy – Viranşehir Yeka GES – 4 – Şanlıurfa | RHG Enertürk | 50 | Şanlıurfa | 2025 | Tender Preparation and Energy Efficiency Analysis |
| Sancak Hibrit GES | Sancak Holding | 50 | Konya | — | Investor Engineering |
| Trakya Döküm – Soyak Energy – 2 | Trakya Döküm | 50 | Mersin | 2024 | Investor Engineering |
| Trakya Döküm – Soyak Enerji – 1 | Trakya Döküm | 50 | Mersin | 2024 | Investor Engineering |
| Yakaağzı GES – İş Enerji – Ağrı | Yakaağzı GES | 50 | Ağrı | — | Investor Engineering |
| Akın Holding – Mini YEKA Aksaray SPP – Aksaray | Akın Holding | 40 | Aksaray | 2022 | Tender Preparation and Energy Efficiency Analysis |
| TUPRAG – Eldorado SPP – Uşak | TUPRAG | 40 | Uşak | 2023 | Energy Efficiency Analysis |
| Erciyes Anadolu Holding – Buyukalan SPP – Antalya | RHG Enertürk | 35 | Antalya | 2020 | Employer Engineering |
| İş Energy – Mardin GES – Mardin | İş Enerji | 35 | Mardin | 2025 | Energy Efficiency Analysis |
| Rama Enerji Yatırımları A.Ş – Amasya HEPP Hybrid SPP – Amasya | Rama Enerji Yatırımları A.Ş. | 33 | Amasya | 2023 | Energy Efficiency Analysis and Contract Management |
| Ado Energy – Adopen SPP – Antalya | Ado Enerji | 32 | Antalya | 2023 | Employer Engineering |
| Artıbir Energy – Küçükköy SPP – Antalya | Artıbir Enerji | 32 | Antalya | 2019 | Energy Efficiency Analysis and Contract Management |
| Demirer Holding – Keltepe WPP Hybrid SPP – Manisa | Demirer Holding | 30 | Manisa | 2025 | Employer Engineering |
| İş Energy – Yakaagzi Wind Hybrid SPP – Agri | İş Enerji | 30 | Ağrı | 2025 | Employer Engineering |
| Kazancı Holding Aksa Enerji Bolu Göynük Termik Hibrit GES | Aksa Enerji | 30 | Bolu | 2023 | Production Work; Hybrid Integration Analysis |
| Sanko Energy – Akyel WPP Hybrid SPP – Konya | Sanko Enerji San. Ve Tic . A.Ş | 30 | Konya | 2022 | Employer Engineering |
| Gaziantep Metropolitan Municipality – Gaziantep Solapark SPP – Gaziantep | Gaziantep Büyükşehir Belediyesi | 27 | Gaziantep | 2023 | Employer Engineering |
| Diler Holding – Diler Sivas SPP – Sivas | Diler Holding | 25 | Sivas | 2024 | Employer Engineering |
| Sanko Enerji San. ve Tic. A.Ş. – Sanko Thermal Hybrid SPP – 2 – Izmir | Sanko Enerji San. Ve Tic . A.Ş | 25 | İzmir | 2024 | Employer Engineering |
| Sanko Enerji San. ve Tic. A.Ş. – Sanko Thermal Hybrid SPP – 3 – Konya | Sanko Enerji San. Ve Tic . A.Ş | 25 | Konya | 2024 | Employer Engineering |