Expertise

Owner's and lender's engineering

Find design problems before they become construction problems.

We sit on the owner's or the lender's side from design review through to provisional acceptance: layout and civil review, electrical design review, technical specification and tender support, and supervision of the works against the specification. We do not produce the design. Our independence depends on that.

DesignBuild

What we do

  • Design and layout review
  • Electrical design review
  • Technical specification and tender support
  • Technical contract management
  • Construction supervision and progress verification

Standards

IEC 62548IEC 62446-1

Projects in this area · 171

PlantInvestorCapacity MWpProvinceYearScope
Kalyon Energy Konya Karapinar 1,300MWp YEKA ProjectKalyon Güneş Enerjisi Üretim A.Ş1,350Konya2020Site Review; Plant Design Review
AKSA ENERJİ – Ali Metin Kazanci Termal Pp – AntalyaAksa Enerji900Antalya2021Employer Engineering
İÇTAŞ Renewable Energy Production and Trade Inc. – İçtaş Bağıştaş HEPP Hybrid – ErzincanIC İctaş140Erzincan2024Energy Efficiency Analysis
IC Ictas – Erzin 2 YEKA SPP – HatayIC İctaş136Hatay2025Field Inspection and Electrical Tests (according to IEC 62446)
Diler Holding – Kars SPP – KarsDiler Holding130Kars2026Employer Engineering
Ecogreen – Bor 2 YEKA SPP – NigdeEcogreen130Niğde2023Employer Engineering
Eksim Holding – Erzin 1 YEKA SPP – HatayEksim Holding130Hatay2024Contract Management and Energy Efficiency Analysis
Turk Telekom – Zara SPP – SivasTürk Telekom128Sivas2025Employer Engineering
Kosovo SPP – Güriş İnşaat Mühendislik İnşaat A.Ş. & Ilgaz Elektrik Üretim A.Ş. – 1Güriş Inşaat Mühendislik A.Ş. & Ilgaz Elektrik Üretim A.Ş.-1120Kosova2025Investor Engineering
Oyak Cement – Ankara 1 SPP – AnkaraOyak Çimento115Ankara2025Employer Engineering
Diler Holding – Diler Konya SPP – KonyaDiler Holding100Konya2026Employer Engineering
RHG Enertürk Energy – Bor Yeka SPP – 4 – NigdeRHG Enertürk100Niğde2022Tender Preparation and Energy Efficiency Analysis
Aydem Energy – Yatagan SPP – MuglaAydem Enerji95Muğla2026Employer Engineering
Erciyes Anadolu Holding – Mini YEKA Van SPP – VanErciyes Anadolu Holding75Van2024Tender Preparation and Energy Efficiency Analysis
Tatlıpınar – Tatlıpınar SPP – 1 – BalıkesirTatlıpınar70Balıkesir2024Employer Engineering
Diler Holding – Diler Agri SPP – AgriDiler Holding55Ağrı2026Employer Engineering
Erciyes Anadolu Holding – Van Arisu SPP – VanErciyes Anadolu Holding55Van2020Employer Engineering
Demirer Holding – Sayalar SPP – ManisaDemirer Holding53Manisa2022Employer Engineering
Acacia Maden – Acacia SPP – AnkaraAcacia Maden50Ankara2022Energy Efficiency Analysis
Demirer Holding – Kuyucak Wind Hybrid SPP – ManisaDemirer Holding50Manisa2023Employer Engineering
RHG Enertürk Energy – Viranşehir Yeka GES – 4 – ŞanlıurfaRHG Enertürk50Şanlıurfa2025Tender Preparation and Energy Efficiency Analysis
Sancak Hibrit GESSancak Holding50KonyaInvestor Engineering
Trakya Döküm – Soyak Energy – 2Trakya Döküm50Mersin2024Investor Engineering
Trakya Döküm – Soyak Enerji – 1Trakya Döküm50Mersin2024Investor Engineering
Yakaağzı GES – İş Enerji – AğrıYakaağzı GES50AğrıInvestor Engineering
Akın Holding – Mini YEKA Aksaray SPP – AksarayAkın Holding40Aksaray2022Tender Preparation and Energy Efficiency Analysis
TUPRAG – Eldorado SPP – UşakTUPRAG40Uşak2023Energy Efficiency Analysis
Erciyes Anadolu Holding – Buyukalan SPP – AntalyaRHG Enertürk35Antalya2020Employer Engineering
İş Energy – Mardin GES – Mardinİş Enerji35Mardin2025Energy Efficiency Analysis
Rama Enerji Yatırımları A.Ş – Amasya HEPP Hybrid SPP – AmasyaRama Enerji Yatırımları A.Ş.33Amasya2023Energy Efficiency Analysis and Contract Management
Ado Energy – Adopen SPP – AntalyaAdo Enerji32Antalya2023Employer Engineering
Artıbir Energy – Küçükköy SPP – AntalyaArtıbir Enerji32Antalya2019Energy Efficiency Analysis and Contract Management
Demirer Holding – Keltepe WPP Hybrid SPP – ManisaDemirer Holding30Manisa2025Employer Engineering
İş Energy – Yakaagzi Wind Hybrid SPP – Agriİş Enerji30Ağrı2025Employer Engineering
Kazancı Holding Aksa Enerji Bolu Göynük Termik Hibrit GESAksa Enerji30Bolu2023Production Work; Hybrid Integration Analysis
Sanko Energy – Akyel WPP Hybrid SPP – KonyaSanko Enerji San. Ve Tic . A.Ş30Konya2022Employer Engineering
Gaziantep Metropolitan Municipality – Gaziantep Solapark SPP – GaziantepGaziantep Büyükşehir Belediyesi27Gaziantep2023Employer Engineering
Diler Holding – Diler Sivas SPP – SivasDiler Holding25Sivas2024Employer Engineering
Sanko Enerji San. ve Tic. A.Ş. – Sanko Thermal Hybrid SPP – 2 – IzmirSanko Enerji San. Ve Tic . A.Ş25İzmir2024Employer Engineering
Sanko Enerji San. ve Tic. A.Ş. – Sanko Thermal Hybrid SPP – 3 – KonyaSanko Enerji San. Ve Tic . A.Ş25Konya2024Employer Engineering

All projects