Performance verification and diagnostics
Know what the asset is really producing.
We calculate performance ratio to the standard rather than to the convenience of the O&M contract. Losses are attributed to their source, the monitoring system's data quality is reviewed, and where production does not match the model we find out why.
OperateTransact
What we do
- Performance ratio verification to IEC 61724
- Loss attribution
- Monitoring system data quality review
- Field failure analysis
- Regular performance evaluation
Standards
IEC 61724-1IEC 61724-2
Projects in this area · 36
| Plant | Investor | Capacity MWp | Province | Year | Scope |
|---|---|---|---|---|---|
| Akfen Renewable Energy – M. Fırıncı IOTA SPP – Malatya | Akfen Yenilenebilir Enerji A.Ş. | 13 | Malatya | 2019 | Regular Performance Evaluation |
| Akfen Renewable Energy – PSI Engil SPP – Van | Akfen Yenilenebilir Enerji A.Ş. | 13 | Van | 2019 | Regular Performance Evaluation |
| Akfen Renewable Energy – MESE SPP – Konya | Akfen Yenilenebilir Enerji A.Ş. | 12 | Konya | 2010 | Regular Performance Evaluation |
| Akfen Renewable Energy – Omicron Erciş SPP – Van | Akfen Yenilenebilir Enerji A.Ş. | 12 | Van | 2019 | Regular Performance Evaluation |
| Akfen Renewable Energy – Yaysun Licensed SPP – Konya | Akfen Yenilenebilir Enerji A.Ş. | 12 | Konya | 2019 | Regular Performance Evaluation |
| Akfen Renewable Energy – Amasya Boyalı SPP – Amasya | Akfen Yenilenebilir Enerji A.Ş. | 11 | Amasya | 2019 | Regular Performance Evaluation |
| Akfen Renewable Energy – Farez, Gunova, Murel, Yesilova, Yesildere SPP – Denizli | Akfen Yenilenebilir Enerji A.Ş. | 7.4 | Denizli | 2019 | Regular Performance Evaluation |
| Pasha Bank – North Star Solar Energy – Emet GES Kütahya | Pasha Bank | 5.72 | Kütahya | 2019 | Visual Inspection; Production Analysis |
| KRK Holding – Zigana Energy – Akmezra SPP Elazığ | KRK Holding – Zigana Enerji | 5.7 | Elazığ | 2018 | Electrical Field Tests; Current Voltage Curve Measurements |
| Venk Renewable Energy – Akören SPP Samsun | Venk Yenilenebilir Enerji | 5.62 | Samsun | 2018 | Electrical Field Tests; Current Voltage Curve Measurements |
| Nev Energy – Nev GES Nevşehir | MMMM İnsan Kaynakları | 5.6 | Nevşehir | 2018 | Electrical Field Tests; Current Voltage Curve Measurements |
| Akgen Energy – Div GES Sivas | Akgen Enerji | 5.51 | Sivas | 2018 | Electrical Field Tests; Current Voltage Curve Measurements |
| Akgen Energy – Akgen GES Adıyaman | Akgen Enerji | 5.5 | Adıyaman | 2018 | Electrical Field Tests; Current Voltage Curve Measurements |
| Akgen Energy – Taşköprü SPP Kastamonu | Akgen Enerji | 5.48 | Kastamonu | 2019 | Production Analysis; Electrical Field Tests |
| Fina Enerji Holding A.S. – Acıpayam SPP Denizli | Fina Enerji Holding A.Ş. | 5.3 | Denizli | 2017 | Electrical Field Tests; Current Voltage Curve Measurements |
| Tekfen Holding – Zen Energy – Karakeçili SPP Kırıkkale | Tekfen Holding | 4.75 | Kırıkkale | 2019 | Electrical Field Tests; Current Voltage Curve Measurements |
| Sabancı Holding – EnerjiSA – Aytin SPP Mersin | EnerjiSA | 4.63 | Mersin | 2019 | Visual Inspection; Production Analysis |
| Sabancı Holding – EnerjiSA – Cagil SPP Kayseri | EnerjiSA | 4.63 | Kayseri | 2019 | Visual Inspection; Production Analysis |
| KRK Holding – Zigana Energy – Firanlar SPP Kütahya | KRK Holding – Zigana Enerji | 3.71 | Kütahya | 2018 | Electrical Field Tests; Current Voltage Curve Measurements |
| Dağbaşı Investment – Efe Energy – Efe SPP Nevşehir | Dağbaşı Yatırım A.Ş. | 3.55 | Nevşehir | 2019 | Visual Inspection; Production Analysis |
| Doğan Holding – Galata Wind Energy – Karayazı SPP Erzurum | Doğan Holding | 2.49 | Erzurum | 2019 | Visual Inspection; Production Analysis |
| KRK Holding – Zigana Energy – Obuz SPP Elazığ | KRK Holding – Zigana Enerji | 2.28 | Elazığ | 2018 | Electrical Field Tests; Current Voltage Curve Measurements |
| BorusanEnBw – Pamuklu SPP | Borusan EnBW | 2.2 | Mersin | 2020 | Visual Inspection; Production Analysis |
| KRK Holding – Zigana Energy – Tepepınar SPP Kütahya | KRK Holding – Zigana Enerji | 2.19 | Kütahya | 2018 | Electrical Field Tests; Current Voltage Curve Measurements |
| KRK Holding – Zigana Energy – Çamurtarla SPP Uşak | KRK Holding – Zigana Enerji | 1.91 | Uşak | 2018 | Electrical Field Tests; Current Voltage Curve Measurements |
| KRK Holding – Zigana Energy – Mira SPP Kütahya | KRK Holding – Zigana Enerji | 1.83 | Kütahya | 2018 | IV Curve Measurements; Thermal Measurements |
| KRK Holding – Zigana Energy – Ahat SPP Uşak | KRK Holding – Zigana Enerji | 1.73 | Uşak | 2018 | Electrical Field Tests; Current Voltage Curve Measurements |
| KRK Holding – Zigana Energy – Wind SPP Kütahya | KRK Holding – Zigana Enerji | 1.7 | Kütahya | 2018 | Electrical Field Tests; Current Voltage Curve Measurements |
| KRK Holding – Zigana Energy – Haydarlı SPP Afyon | KRK Holding – Zigana Enerji | 1.65 | Afyon | 2018 | Electrical Field Tests; Current Voltage Curve Measurements |
| KRK Holding – Zigana Energy – Köycivarı SPP Uşak | KRK Holding – Zigana Enerji | 1.2 | Uşak | 2018 | Electrical Field Tests; Current Voltage Curve Measurements |
| KRK Holding – Zigana Energy – Yumrutaş SPP Kütahya | KRK Holding – Zigana Enerji | 1.2 | Kütahya | 2018 | Electrical Field Tests; Current Voltage Curve Measurements |
| KRK Holding – Zigana Energy – Kadımürsel SPP Afyon | KRK Holding – Zigana Enerji | 1.16 | Afyon | 2018 | Electrical Field Tests; Current Voltage Curve Measurements |
| KRK Holding – Zigana Energy – Karakuyu SPP Uşak | KRK Holding – Zigana Enerji | 1.1 | Uşak | 2018 | Electrical Field Tests; Current Voltage Curve Measurements |
| Genel Değirmen Makine – Genel Değirmen GES Konya | Genel Değirmen Makine | 1 | Konya | 2017 | Electrical Field Tests; Current Voltage Curve Measurements |
| Fina Enerji Holding A.Ş. – Çardak SPP Denizli | Fina Enerji Holding A.Ş. | 0.71 | Denizli | 2017 | Electrical Field Tests; Current Voltage Curve Measurements |
| Eltes Electricity – Eltes SPP Kayseri | Eltes Elektrik A.Ş. | 0.56 | Kayseri | 2018 | Electrical Field Tests; Current Voltage Curve Measurements |