Construction quality and factory inspection
Verify the modules before they reach the site.
Surveillance in the factory while the modules are produced: conformity of the bill of materials with the certified design, in-line and end-of-line checks, and review of electroluminescence and flash-test records. On site we inspect workmanship and installation quality during construction.
Build
What we do
- Production line surveillance
- Bill of materials and certificate conformity
- Electroluminescence and flash-test review
- Pre-shipment inspection
- Site quality inspection
Standards
IEC 61215IEC 61730IEC TS 62941
Projects in this area · 17
| Plant | Investor | Capacity MWp | Province | Year | Scope |
|---|---|---|---|---|---|
| Kalyon Energy Konya Karapinar 1,300MWp YEKA Project | Kalyon Güneş Enerjisi Üretim A.Ş | 1,350 | Konya | 2020 | Site Review; Plant Design Review |
| SAZAK SPP – Uğurlular Tekstil | Uğurlular Testil | 60 | Denizli | 2026 | Solar Panel Inspection |
| Aldo Energy Project Toros SPP Projects | Aldo Enerji | 56 | N/A | 2024 | Solar Panel Inspection; Field Inspection and Electrical Tests (according to IEC 62446) |
| Tegnetia – Uluborlu SPP | Tegnatia | 55 | Isparta | 2025 | Solar Panel Inspection |
| Maxima Enerji – Cb GES – Niğde | Maxima Enerji | 51 | Niğde | — | Mobile EL |
| Iltekno – Gümüşdoğa SPP – Ankara | İltekno | 34 | Ankara | 2025 | Solar Panel Inspection |
| Adopen – Adopen 2 SPP – Antalya | Adopen | 18 | Antalya | 2024 | Solar Panel Inspection |
| Boğaziçi Petrol – Zengin Petrol SPP – Kayseri | Boğaziçi Petrol | 18 | Kayseri | 2023 | Solar Panel Inspection |
| Masfen Energy – Gitaş 1 SPP – Konya | Masfen Enerji | 14 | Konya | 2021 | Solar Panel Inspection |
| Masfen Energy – Metges SPP – Konya | Masfen Enerji | 11 | Burdur | 2019 | Solar Panel Inspection |
| Citus Energy – Citus Energy | Citus Enerji | 5.86 | Kayseri | 2018 | Factory Inspection |
| Heran Energy – Elin Energy Panel Factory Inspection | Heran Enerji | 5 | Ankara | 2022 | CDF-BoM List Compatibility; Panel factory production line inspection |
| SAĞ – TUR GES – Sağtur | SAĞ-TUR GES | 4 | Isparta | 2023 | Factory Inspection |
| KRK Holding – Ozgun Construction SPP – Konya | KRK Holding | 3 | Konya | 2025 | Field Inspection; PV Module Inspection |
| Maxima Energy Electroluminescence EL Imaging | Maxima Enerji | 1.09 | Nevşehir | 2020 | 1st Hand Imaging |
| Ford Otosan – Sancaktepe SPP – Istanbul | Ford Otosan | 1 | İstanbul | 2025 | Field Inspection; PV Module Inspection |
| Sena Cable SPP | Sena Kablo | 0.85 | Denizli | 2021 | Solar panel factory inspection |